Recently, Beitou Water Company first tried to use robots to assist underground operations in the sewage dredging work, and achieved good results.
The rainy season is about to come, and the urban sewage pipe network will be under tremendous pressure. In order to do a good job in urban water environment management and flood control preparation, and to ensure the smooth flow of the sewage pipe network of the operation project, Beitou Water Company has actively invested in the dredging construction of the sewage pipe network. The dredging time of the pipe network is one month, ranging from the intersection of Longshan South Road of Dongxing Avenue to the old railway mouth of Yuzhouping, the railway station of Dongxing Avenue to Luowu Village, and the Hengxin Garden to Beibuwan Avenue of Taoyuan Road. The main pipe with a diameter of 600 mm to 1000 mm and 7 inverted inverted pipes, 31 inspection wells and 7 sewage lift pump stations.
Due to the large amount of toxic and harmful gases such as biogas, sulfur dioxide and carbon monoxide stored in the sewage pipeline, the risk of operation in the pipeline is high, and the underground operation is a high-risk industry. In order to improve the safety operation coefficient of the underground, the company hired a construction team with professional technical capabilities, and used robots to assist underground operations for the first time, greatly improving work efficiency, effectively protecting personal safety and speeding up dredging progress. At present, the dredging work has all been successfully completed.
Optical Prism,Dispersion Prism,Si Right Angle Prism,Chandelier Prisms
Danyang Horse Optical Co., Ltd , https://www.dyhorseoptical.com